Allied Technologies - Super Hot Boilers
  • Facebook
  • Google
  • Twitter
  • Home
  • Corporate
    • About Us
    • Careers
  • Product Lineup
    • ALL PRODUCTS
    • AAA Commercial Gas Boiler
    • MG Mini-Gas Boiler
    • SSC Space Saver Combo
    • SG Saturn Series Boiler
    • MSE Mini-Star Electric Boiler
    • EPJ Indirect Fired Water Heater
    • EPP Indirect Fired Water Heater
    • EPP Stainless Steel Storage Tank
    • Electric Booster Water Heater
    • C-Coil Tankless Water Heater
    • CX Heat Exchanger
    • Discontinued Products
      • AAE Commercial Gas Boiler
      • GSE Boiler
      • HSE High-Efficiency Condensing Boiler (DISCONTINUED)
      • SC Sealed Combustion
      • BT Electric Boiler
      • E Electric Boiler
      • TC Electric Boiler
    • Product Service Bulletins
  • Resources
    • News & Events
    • Product Service Bulletins
    • Literature Downloads
    • Commercial Specification Submittal Form
    • Warranty Registration
  • Contact
    • Contact
    • Contact Form
    • Newsletter Signup
    • Wholesaler Access
      • Return Authorization Request
Home» Products » MG Updates » Replacement Part Orders for MG & SG Series Gas Boiler Pilots

Replacement Part Orders for MG & SG Series Gas Boiler Pilots

0

This notice is to inform that changes have been made to the MG and SG Series gas boilers electronic ignition pilot assemblies (January 2013). This change affects the following models in both natural gas and propane.

MG SERIES: MG-50-E, MG-75-E, MG-100-E, MG-125-E, MG-150-E
SG SERIES: SG-135-E, SG-180-E, SG-225-E, SG-270-E, SG-315-E, SG-360-E, SG-450-E

Since the pilot bracket and hood angle has changed, replacement pilots for these models must
be ordered and replaced as an assembly including the bracket and pilot supply tubing.
When ordering a replacement pilot, please use the following descriptions:
Pilot Assembly – MG – Universal
Pilot Assembly – SG – Universal

MG SG Pilot Assembly

For more details contact your local sales representative.

If you have any questions regarding this bulletin, please do not hesitate to contact Tony Woo at tony@alliedboilers.com or 604-929-1214.

© Allied Technologies
  • Terms of Use
  • Privacy Policy
  • Contact